LX Series Steam Boiler
EX Series Steam Boiler
Multiple Installation System
XJ1
On-Line Maintenance






 
Revolutionary Concept For Multiple Boiler Steam Systems
Fast Steam  

in 5 minutes or less from a cold start-up. This is achieved through our revolutionary floating header design. Standard firetubes require start-up times from 1 to 1.5 hours.
Smaller, more efficient MIURA Boilers can be turned on (or off) like a light switch. Shut boilers off when not required and bring them on line just as quickly.
Until now, multiple boiler steam systems ranging from 100 to 4 5000 BHP meant installing one firetube or watertube boiler for peak loads with another boiler of the same size for back up.

   
Situation: The system wants steam, and it wants it now - convention firetube and watertube technology can't manage quick steam demands.
Keeping stand-by boilers hot so they can quickly come on line when steam demands picks up, or take over if the primary boiler breaks down results in wasted fuel and increased costs.
     
Relolutionary Solution...   The MIURA Boiler "Floating Header" design delivers full steam output within five minutes from a cold start-up. Multiple boilers are tied together with MIURA's Multiple Installation (MI) software, programmed to match your particular steam patterns, acting as one large boiler with multiple back-up and almost infinite turn down.
When steam demands picks up, the MI controller compensates by forcing on line boilers to high fire while additional units are brought on line. When steam demand slows,the MI controller reduces output and, if necessary, tales boilers off lone quickly and efficiently.

Click here to learn more about MIURA Boiler's EX Series and other revolutionary steam boilers
Copyright ©2006 Chaudières/Boilers Inc.
Website by Digital Duck Inc.