- A pressure sensor quickly senses pressure swing
in the header. The panel, MP1 sends an ON or OFF signal
to the boiler MI controller, MT1.
- The Master Panel brings boilers on line when needed,
and only when needed, in order to match high load
patterns, even during low load demands - for the highest
possible In-Service efficiencies.
- The Master Panel brings back-up boilers on line
automatically, in the rare chance a boiler breaks
down, for a safe reliable steam supply.
- Combustion patterns can be programmed by the operator
to match your Plant's load pattern.
- Up to 15 boilers can be tied together on one master
panel. Therefore planners cab buy only the boilers
they need currently and easily add boilers as the
plant expands in the future. Valuable resources can
be used for other projects
|
 |
|
|
|
|